Vol. 3 EIAR Appendices

Appendix 2-1 Scoping Replies

Appendix 2-2 Community Engagement Report

Appendix 2-3 Cumulative List

Appendix 4-1 Planning Drawings - Part 1
Appendix 4-1 Planning Drawings - Part 2
Appendix 4-1 Planning Drawings - Part 3

Appendix 4-2 Peat and Spoil Management Plan

Appendix 4-3 Drainage Drawings

Appendix 4-4 Surface Water Management Plan

Appendix 4-5 Construction and Environmental Management Plan

Appendix 4-6 Decommissioning Plan

Appendix 4-7 Crumhach Wind Farm 110kV Grid Construction - Construction Methodology

Appendix 4-8 Crumhach Wind Farm 110kV Grid Construction - Detailed Drawings - Part 1
Appendix 4-8 Crumhach Wind Farm 110kV Grid Construction - Detailed Drawings - Part 2

Appendix 5-1 Wind Farms & Health Literature Review (Chapman 2015)

Appendix 5-2 Comparative Shadow Flicker Report

Appendix 6-1 Botanical Assessments

Appendix 6-2 Bat Report

Appendix 6-3 Aquatic Baseline Report

Appendix 6-4 Biodiversity Management and Enhancement Plan (BMEP)

Appendix 6-5 Invasive Species Management Plan Appendix 7-1 Survey Effort

Appendix 7-2 Species List

Appendix 7-3 Summary Data

Appendix 7-4 Survey Data - Part 1
Appendix 7-4 Survey Data - Part 2

Appendix 7-5 Confidential Appendix Cover Page

Appendix 7-6 Collision Risk Assessment

Appendix 7-7 Bird Monitoring Programme

Appendix 8-1 Geotechnical and Peat Stability Report

Appendix 9-1 Flood Risk Assessment

Appendix 9-2 Surface Water Sampling Laboratory Reports

Appendix 9-3 Water Framework Directive Compliance Assessment

Appendix 9-4 Topographic cross-sections between the Proposed Wind Farm and the Ox Mountain Bogs SAC